Controlled river flow enters the restored intake and penstock system.

Aksu-1. A new current.
A historic hydropower site, restored for a new generation of local energy.
A proven site.
A new energy chapter.
Built on the site of the former Aksu-1 hydropower station, SD Eco is restoring a piece of Uzbekistan’s energy heritage with modern engineering.
The project uses cross-flow turbine technology designed for strong performance under variable and lower water-flow conditions. The result is a resilient, efficient source of clean electricity designed around the realities of the local river system.
See how the build is progressing ↗
One continuous
energy system.
Water is guided through the restored Aksu-1 infrastructure, converted into mechanical energy by the cross-flow turbine, then delivered as clean electricity to the grid.
Cross-flow technology transforms water pressure into dependable rotation.
Generated electricity is conditioned and supplied to Uzbekistan’s national grid.
Project works · KashkadaryaEnergy that stays
close to home.
Small hydropower adds dependable renewable capacity close to the communities it serves. SD Eco will feed locally produced electricity into Uzbekistan’s national grid while restoring infrastructure with a productive history.